Important Work Experiences - Time respectively
A - Executive works in private and contractor section
- Supervisor of infrastructure facilities at Qasr-e-Shirin new city, Kermanshah, Iran - Madiran Company
- Technical and executive supervisor of Kermanshah museum, Kermanshah, Iran - Concrete structure - Dodan Company
- Site manager of children hospital project (200 beds), Kermanshah, Iran - Steel structure - Sooleh Team company
- Technical supervisor of Bakhtar leather facotory, Kermanshah, Iran - Concrete and steel structure - Accompaniment with the contractor
- Technical protocol with project management of central building of Oil engineering company (40'000 sqm) - Kamraniyeh, Tehran, Iran
- Technical protocol with project management of a complex in Pardis Technology Park (7'000 sqm)
- Technical protocol with project management, design and construction of grand tourism complex of Imam Reza, Mashad, Iran
- Technical supervisor protocol with the contractor of gas compressure project, Siri Island site, IGC, Persian Gulf, Iran
- Technical and executive consultant protocol of prepareing project of the Pardis Technology Park, 3rd phase, Presidential Technology Office, Tehran, Iran
- Site manager of Hanieh Hotel (5 stars), Mshhad, Iran - 22'000 sqm including parking and shopping center. (Photo Album)
- Technical and executive protocol with project management of Technology City of Isfahan, Isfahan, Iran
Recent Contractor-Management works
Sahel Sepehr Project, Contractor management of Ministrial and educational building, 11'000 sqm concrete and steel structure project, Employer: Physical Developement and Research Center (PDRC), and Sepehr Saderat, with Hendeseh Group, 2011 - 2012
Website - Photo Album
Contractor works
EPC project, steel structure of Golestan Building, private section, Employer: Mr. Ghanizadeh, Sa'adat Abad, Tehran, Iran, 2012
B - Supervisory in governmental section (Associated with Ministry of Roads and Urban Development)
- Control and supervision of construction projects of army and housing cooperative of army (Awarded at the military service)
- Supervision and housing in Kermanshah Province - Ministry of housing and ufban development - Kermanshah, Iran
- Supervision of the hospital of Harsin (96 beds), Kermanshah, Iran
- Supervision of the hospital of Javanrood (96 beds), Kermanshah, Iran
- Supervision of the hospital of Songhor (96 beds), Kermanshah, Iran
- Supervision of the hospital of Gilan-e-Gharb (96 beds), Kermanshah, Iran
- Supervision of the children hospital of Kermanshah (Dr. Mohammad Kermanshahi, 200 beds), Kermanshah, Iran
- Supervision of campus development and office complex of Ghasr-e-Shirin, Kermanshah, Iran
- Supervisor of organization houses in Javanrood, Kermanshah, Iran
- Supervision and coordination of the 800m subway project in Shiraz, Iran - Ministry of housing and urban development.
- Supervision and coordination of 25 housing project in Tehran city, Iran - Ministry of housing and urban development.
- Coordinator expert for projects of central provinces of Iran in Ministry of housing and urban development.
- Consultant of preparing the Pardis Technology Park in phase 3, and installation channel.
C - Supervisory in private section
- Supervision on sugar refinary factory of Bistoon, Kermanshah, Iran.
- Supervision on road making project in industrial cities of Madiran Company.
- Supervision on residential and industial buildings in private section since 1990.
- Supervisor of railway station of Bam and the stations between Kerman and Bam, Iran
- Supervision of reinforcement of Noor ophthalmology clinic (7'000 sqm), Tehran, Iran
- Head supervisor of Malulin Sport Complex, (18'000 sqm), municipality region no. 20, Tehran, Iran. (Awarded in Architecture Mag.)
- Head supervisor of Professional Theater Complex of Tehran (16'000 sqm), Tehran, Iran. (Photo Album)
- Head supervisor of Imam Reza Stadium (10'000 seats), Yaft Abad, Tehran, Iran. (Photo Album)
- Supervision on construction and optimization of Mozhdeh residential building (6'000 sqm), Mozhdeh St. Tehran, Iran. (Photo Album)
Design and calculations, since 1990
Design, calculation and control of structures of apartments, residential, ministrial, industrial, recreational and sport buildings in private and govertnemtal sections:
- Calculation of Kerend Cultural Center, Kermanshah, Iran
- Calculation of organization residential amartments of Kermanshah Ministry of Housing and Urban Development, Kermanshah, Iran
- Calculation of Hosseiniyeh (religeous center) of Kish, Kish Island, Persian Golf, Iran
- Design and calculation of courthouse building of Eslam Abad, Kermanshah, Iran
- Partnership in design and calculation of Kermanshah towns, Sarzamin Consultant, Kermanshah, Iran
- Technical and execution protocols for structure control of projects under management of Physical Development and Research Center (PDRC), including Oil Company projects, presidential central office and research buildings of technology parks of Tehrn and Isfahan.
- Head of calculation and responsible for reinforcement of Kolah-Farangi building, ministry of telecommunication (3'000 sqm).
- Head of calculation and responsible for Iran Atlas Company administrative building (9 stories, 6'000 sqm. Pasdaran St. Tehran, Iran)
- Head of calculation and responsible for Multi recreational complex of Saderat Bank, Bandar Abbas, Persian Gulf, Iran (6'000 sqm.)
- Head of calculation and responsible for Saderat Central Bank building of Sari (17 stories, 20'000 sqm.), Sari, Iran.
- Head of calculation and responsible for East Pardis Cultural and Commercial complex (75'000 sqm.), Tehran, Iran
- Head and responsible for calculation and supervision of Tehran Professional Theater Center (16'000 sqm. rehabilitation and reinforcement simultaneously with supervision). (Photo Album)
- Head of calculation and responsible for central building of Orumieh Technology Park (17'000 sqm. substructure), Orumieh, Iran.
- Head of calculation and responsible for Andisheh City Commercial Complex project (13'500 sqm.), Tehran, Iran.
- Head of calculation and responsible for Hashtgerd Project (25'000 units, 36 towers, 11 to 18 stories, 300'000 sqm. substructure). Link
- Head of calculation and responsible for central building of Kermanshah Technology Park (18'000 sqm. substructure), Kermanshah, Iran. (Photo Album)
- Head of calculation and for substructure facilities, preparation, design and supervision on buildings in the West Azerbaijan Technology Park, Iran.
Associated engineers in Hendeseh Mehvar Engineering Group
No. |
Name |
Education |
Resume - Top hints |
1
|
Mr. Majid Reza Peirovinasab
|
B.S. Civil Engineering
Gratuation: 1982
|
- Project manager of Stadium (6'000 seats).
- Project manager of the Tehran Professional Theater Center, Tehran, Iran.
- Project manager of Eslamshahr Hospital (400 beds), Tehran, Iran.
- Head of supervision on Bazaar-e-Charsoogh cultural and commercial omplex(infront of Ala'eddin passage), Tehran, Iran.
|
2
|
Mr. Mohammadjavad Bahadori
|
B.S. Civil Engineering
Sharif University of Technology, 1989
|
|
3
|
Mr. Majid Fazayeli
|
Birthday: 1973
B.S. Civil Engineering
|
1. Shahre Aftab - International Exhibition
2. Haniyeh 5 Stars hotel - Mashhad (Structure)
3. Narges Hotel - Mashhad - Foundation
4. Arman Hotel - Mashhad - 90'000 Sqm
5. Emam Reza hotel - Mashhad - 37'000 sqm
|
4
|
Mr. Parviz Torkashvand
|
Birthday: 1979
B.S. Civil Engineering
|
- 10 years of accompaniment with Hendeseh Group
- Calculator and head of the technical office for Sahel Sepehr project, Sa'adatabad, Tehran, Iran
|
5
|
Mr. Mohammad Rahbari
|
B.S. Civil Engineering
|
- accompaniment with Hendeseh Group
- Site manager of Sahel Sepehr project, Sa'adatabad, Tehran, Iran
|
6
|
Mr. Safa Daneshvar
|
M.Sc. Civil Engineering, Geotechnical Engineering
|
Construction Execution
|
4
|
Mr. Hashem Zargoosh
|
Birthday: 1965
B.S. Civil Engineering
Elm-o-San'at University
|
- Construction manager of South Pars Project, Phase No. 12
- Construction manager of wheat silos.
|
7
|
Mr. Morteza Niknam
|
Birthday: 1984
B.S. Civil Engineering
|
Calculation - Supervision - Executive
|
8
|
Mr. Esmaeil Jashnesadeh
|
M.Sc. Civil Engineeing, Transportation Engineering
|
Construction and calculations
|
9
|
Mr. Saeid Yousefi
|
M.Sc. Civil Engineering, Structure Engineering
|
Calculations
|
10
|
Mr. Morteza Shahbazi
|
M.Sc. Civil Engineering, Earthquake Engineering
|
Calculations
|
12
|
Mr. Majid Afshari
|
M.Sc. Civil Engineeing, Transportation Engineering
|
Construction and calculations
|
13
|
Mr. Hossein Chizari
|
B.S. Civil Engineering
|
Construction Execution
|
14
|
Mr. Shayan Etminani
|
B.S. Civil Engineering
|
Construction Execution
|
15
|
Mr. Mohammad Mohammadi
|
Birthday: 1980
M.S. Architecture - Yazd University
|
Architect of Plastic Injection factory project in Parand industrial town
|
16
|
Mr. Mehdi Eghbali
|
Birthday: 1980
M.S. Architecture - Yazd University
|
Architect supervisor of Plastic Injection factory project in Parand industrial town
|
17
|
Mr. Amin Ashrafzadeh
|
M.Sc. Civil Engineering - Structure
|
Fajr Project - 550 unit - Office supervisor - 80'000 Square meter
Zahedan Project - 550 Unit - 60'000 Square meters - Supervisor
Quality Control in Hanieh 5stars hotel, Mashhad - 23'000 Square meters
|
18
|
Mr. MohammadMehdi Nikoo
|
M.Sc. Architectural Engineer
|
|
19
|
Mr. Morteza Niknam
|
|
Calculation - Supervision - Executive Engineer
|
Pictures of projects (Construction, Calculation and Supervision)
Link to G+ Photo Albums
Sahel Sepehr Project, Administrative and Educational building
Employer: Physical Development and Research Center (PDRC)
Address: 2nd east Sahel alley, North Motahari St. Darya Blvd. Sa'adatabad, Tehran, Iran
Protocol type: Management-Contractor, Design and Construction
Technical specfications: 3 stories for parking, 6 administrative stories, about 10'000 sqm. substructure, concrete and steel structure are applied in this project.
Website - Photo Album |
|
July 27, 2011 |
1391/03/05 |
Sahel Sepehr Project - Parking ramp |
Important points in the project:
Because of the neighbors, the nailing system had stoped and the ground floor structure constructed in order to safety of adjacent buildings. Then the soil of the neighbors' side excavated and ramp diaphragm and retaining wall were applied from top to bottom, finaly the foundation was applyed.
March 2011
|
Sahel Sepehr Project - Sa'adatAbad, Tehran
Website - Photo Album |
Sepand - Residential Complex
Sepand Residential Building
Employer: Haft Bana Co.
Address: Sepand St. Ajoodanieh Ave. Tehran, Iran
Type of contract: Contractor Management
Technical Specification:
Steel Structure
5700 square meters
At stage: Foundation
Date: October 6, 2016
|
|
PHOTO ALBUM |
|
Pasargad International Wrestling Academy
|
Pasargad International Wrestling Academy
Employer: Pasargad Bank
Address: Azadi Sport Complex, Tehran, Iran
Type of contract: Project Manager
Technical Specification:
Pretentioned concrete
7500 Square meters
Timeline:
June 22, 2018: Start of contract
October 23, 2018: 85% total progress
Interesting facts:
Because of employer's choice, after finishing the structure, there were no contract with the main contractor, and all suppliments containing materials and equipments and executive processes was performed by various different contractors.
PICTURES
|
|
Central building of Kermanshah Technology Park
Employer: Jahad Daneshgahi of Kermanshah
Address: 22 Bahman cross, Kermanshah, Iran
Photo Album
|
|
|
Protocol type: Calculations and supervision
Technical specfications:
The first tower and commercial units, waiting saloons, the central lobby and the bank (20'000 sqm.), steel structure. |
Important points in the project:
An amphitheater saloon with a width of 6m and height of 4m and length of 100m as a bridge in 60m elevation located between the two towers.
Meanwhile the architectural characteristics induced to apply the braces totally on the external surface without any gassetplates. |
|
Hanieh Hotel (5 Stars), Mashhad, Iran
Employer: Bonyad-e-Maskan-e Enghelab
Address: North East side of the Haram, Mashhad, Iran
Photo Album
|
|
|
Protocol type: Accompaniment in management-contractor and site management
Technical specfications:
- Steel Structure
- Field area: 3431 sqm
- Substructure: 22'100 sqm
- 10 stories including 5 star hotel with 130 rooms and service and administrative areas, public place, sport complex and 2'800 sqm. commercial space.
|
Important points in the project:
Construction speed was the major point in this project; the time to installation total structure from the top of the foundation level was about 8 months. Simultaneously next parts of construction like facilities and architectural works were embeded in the structural process.
|
|
Reihaneh Hashtgerd, Residential Complex (2440 units)
Structure design for lightweight construction
|
|
Employer: Naji Sazan Amin Institute
Address: Hashtgerd new city, Tehran, Iran
Protocol type: Calculations and Value engineering
Technical specifications:12 blocks of 16 and 18 stories.
Substructure: 343'000 sqm.
|
Important points in the project:
Structure maps made by the first consultor were designed for 135 kg per square meter. four 1st grade contractor began to work according to the primary plan after winning in the related tender and at the beginning the employer made a protocol with Daneshvar and cooperators group to recalculate the structure due to lightweight construction (value engineering to modification). As a result they reached to an about 38.5 percent of reduction in weight (52 kg reduction per square meter) and the project with the mentioned substructure (343'000 sqm) were finaly constructed (19 stories towers with the weight of 83 kg per sqare meter were the final statement of contractor).
Meanwhile, because of the lightweight design and saving 30 billion tomans cost in this construction, all maps were confirmed by Mr. Tahooni's company for employer's records.
Photo Album |
Malulin Sport and Recreational Complex
Awarded in Architecture Magazine
Imam Reza Stadium (10'000 Seats)
Employer: Cultural space development company
Address: Yaft Abad, Tehran, Iran |
|
|
Protocol type: High graded supervision
Technical specifications:
Concrete structure
Photo Album
|
The Professional Theater Center of Tehran City
The main stage, Professional Theater Cener of Tehran, Tehran, Iran |
|
Employer: Cultural space development company
Address: Khavaran Cultural Center, Tehran, Iran
Protocol type: Calculations and high graded supervision
Technical specifications:
Steel structure
8 saloons for show and practise including the main saloon with 800 seats and 20m height for the scene tower (Is shown in the pictures for before and after).
Important points in the project:
Reinforcement calculations for some important parts of the old structure like scene tower.
Photo Album
|
|
Administrative building of tranportation
Municipality of Tehran, Region No. 6
Employer: Municipality of Tehran, Region No. 6
Address: Karimkhan St. Valiasr Sq. Tehran, Iran
Photo Album
|
|
|
Protocol type: Calculations and supervision management
Technical specifications:
Steel structure
Substructure: 5'000 sqm. |
Kashanak Residential Complex
Awarded in Architecture Magazine
Employer: Mr. Ali Ghanizadeh
Designer: Mr. Arash Mozaffari
Address: No. 35, Mehdizadeh St. PourEbtehaj St. Tehran, Iran
Protocol type: Calculations and technical supervision on construction
Technical Specifications:
11 residential units with areas of 75 to 230 sqm.
Start time: 2007
End time: 2011
http://memar-m.com/
http://daneshvar.ir/arya/arcmag |
|
Mozhdeh Residential Building
Employer: Private section
Address: Mozhdeh St. Tehran, Iran
Protocol type: Technical supervision on construction
Technical specifications:
Steel structure
Substructure: 6'000 sqm.
Photo Album
|
|
|
|
Andisheh building
Employer: Municipality of Andisheh
Address: Andisheh town
Protocol type: Structure design
Technical specifications:
Steel structure
Substructure: 6'000 sqm. |
|
Golestan building
Employer: Private section
Address: Golestan St. Sa'adat abad, Tehran, Iran
Protocol type: EPC
Technical specifications:
Steel structure |
|
Mahtab Project
Employer: Sepehr Investment Company, Saderat Bank
Address: Mahtab Alley, Artesh Blvd. Tehran, Iran
Protocol type: Managing Contractor
Technical specification:
Steel Structure with bolt, Screw system
Field Area: 1'990 square meters
Area: 23'187 square meters
Floors: 15
Use: Residential, Commercial
|
|
Excavation operations: 34'075 Cubic meters
Shotcrete and soil stabilization operations: 3'255 Square meters
Fondation and Reinforcement: 137'000 kg
Concrete: 2'600 Cubil meters
Structure weight: 3000 tons |
Recent projects by Hendeseh Mehvar Engineering Group
Parand Industrial Project
Employer: Sepehran Polymer Compnay
Address: No. D7, Maryam Blvd. Parand Industrial Town, Saveh highway, Tehran, Iran
Type of the contract: Design, Architectural and MC
Concrete: 2'600 Cubil meters
Structure weight: 3000 tons
Technical specification:
9770 square meter: including production spaces
670 square meter: Industrial Central heating
1000 square meter: Workers building
2100 square meter: Administrative building
2 Construction phases: Pre utilization and during the utilization |
|
|
Special points:
Utilize the structure production line in the site
Constructing the structure in the middle, so that warehose and production line is possible in the both upside and down.
|
|
|
|
Regarding to lack of the field and sound and environmental pollutions, 670 square meter of basement area was constructed for the central heating system and grinding room.
|
Flooring with Epoxy layer
Production saloon - Placement of the first plastic injection system |
Etehad Residential Building
|
|
Etehad Residential Building
Employer: Hendeseh Engineering Group
Address: Old region No. 10, Tehran, Iran
Technical Specification:
Concrete structure
15 Unit
|
Sabili Residential Building
|
|
Sabili Residential Building
Employer: Hendeseh Engineering Group
Address: Old region No. 10, Tehran, Iran
Technical Specification:
Concrete structure
10 Unit |
Industrial Wastewater Treatment Plant - Ahwaz Eastern
|
Industrial Wastewater treatment plant - Ahwaz Eastern
Kayson & Musharif - Joint Venture
Design Core
Type of contract: Design and consulting for structure with cooperating of the Design Core.
|
|
|
|